Visbeck Compressor Station – Exxon Mobil

A synopsis of work carried out

  • Gas producer assembly change over (new 4 oid)
  • Installed replacement Gas producer and bolted to PT
  • Reinstalled side mounted assesory Gearbox and Starter motor
  • Reinstalled all ancillary equipment, removed whilst removing old Gas producer
  • Removed the out put shaft assembly for alignment checks (Engine to Compressor)
  • Replacement P.T to Compressor out put shaft assembly
  • Prepared new Gas Compressor for crank washing
  • Replace main lube oil filters having inspected drained oil
  • Reinstalled all the necessary equipment unit started and lite – off and acceleration to idle
  • All vibration levels checked at idle and maximum speed. Adjusted accordingly
  • Units 1 and 2 left in operational condition
  • Loop Testing
  • Instrumental Calibration
  • Fault finding and repair
  • Verification and amendments to As Built Drawings