Visbeck Compressor Station – Exxon
Mobil
A synopsis of work carried out
- Gas producer assembly change over (new 4 oid)
- Installed replacement Gas producer and bolted
to PT
- Reinstalled side mounted assesory Gearbox
and Starter motor
- Reinstalled all ancillary equipment, removed
whilst removing old Gas producer
- Removed the out put shaft assembly for alignment
checks (Engine to Compressor)
- Replacement P.T to Compressor out put shaft
assembly
- Prepared new Gas Compressor for crank washing
- Replace main lube oil filters having inspected
drained oil
- Reinstalled all the necessary equipment unit
started and lite – off and acceleration
to idle
- All vibration levels checked at idle and maximum
speed. Adjusted accordingly
- Units 1 and 2 left in operational condition
- Loop Testing
- Instrumental Calibration
- Fault finding and repair
- Verification and amendments to As Built Drawings
<<