Rolls Royce, Bootle/Croydon

We were responsible for the initial trial build up of the enclosure at Rolls Royce Power Engineering Bootle prior to delivery to site, making any modifications that were required to enable the fitting and removal of the GT (Rolls Royce Trent) without any internal clashes. Erected the steel structure and fitted the acoustic panels that formed the sides and roof of the GT enclosure/auxiliary skid and control room, along with all associated ductwork, ie combustion intake, vent intake, vent exhaust. MacGregor & Associates also had some input with the design of the internal GT walkways and auxiliary skid platform working/maintenance areas, which we fabricated up on site. Installed Maintenance Crane.

<< Back to Location Map