Songas - Umbungo Power Station

A synopsis of work carried out:

  • Monitored Turbine Lube Oil flush, change screens
  • Prepared GT4 for Start and monitored
  • Trouble shooting GT4
  • Borescoping
  • Water wash GT3, wirelock Boroscope plugs, connect various pipes and hoses
  • Clamshell disconnects of Gas Turbine


<< Back to Location Map